Sand Diamond Cardigan |
|||||||||||||||||||
|
|
||||||||||||||||||
Knitted jacket in DROPS Daisy or DROPS Merino Extra Fine. The piece is worked top down with raglan, V-neck, lace pattern and ¾-length sleeves. Sizes S - XXXL.
DROPS 248-5 |
|||||||||||||||||||
------------------------------------------------------- EXPLANATIONS FOR THE PATTERN: ------------------------------------------------------- GARTER STITCH (worked back and forth): Knit all rows, from both the right and wrong side. 1 ridge in height = knit 2 rows. PATTERN: See diagrams A.1 to A.8. The diagrams show all the rows in the pattern seen from the right side. RIGHT BAND WITH I-CORD: RIGHT SIDE: Work 10 garter stitches, slip 1 stitch purl-wise with strand in front, knit 1. WRONG SIDE: Slip 1 stitch purl-wise with strand in front, knit 1, 10 garter stitches. LEFT BAND WITH I-CORD: RIGHT SIDE: Slip 1 stitch purl-wise with strand in front, knit 1, 10 garter stitches. WRONG SIDE: Work 10 garter stitches, slip 1 stitch purl-wise with strand in front, knit 1. RAGLAN: Increase 1 stitch by making 1 yarn over, which is worked twisted on the next row. The new stitches are then worked in stocking stitch. BUTTONHOLES: Work the buttonholes on the right band from the right side. ROW 1: Work until there are 4 stitches left on the row, make 1 yarn over, knit 2 together, finish the band as before. ROW 2: Knit the yarn over (other band-stitches as before) to leave a hole. The first buttonhole is worked when the increases for V-neck are finished (front piece measures approx. 23 cm, from top of shoulder). The other buttonholes are worked when the front piece measures (from top of shoulder): S: 29, 36 and 43 cm M: 30, 38 and 45 cm L: 30, 39 and 47 cm XL: 30, 39 and 48 cm XXL: 31, 40 and 50 cm XXXL: 31, 41 and 52 cm (= the last buttonhole is worked in the transition between the stocking stitch and rib at the bottom of the front piece). DECREASE TIP (for sleeves): Decrease 1 stitch on each side of the marker-stitch as follows: Work until there are 2 stitches left before the marker-stitch, knit 2 together, knit 1 (= marker-stitch), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch. ------------------------------------------------------- START THE PIECE HERE: ------------------------------------------------------- JACKET - SHORT OVERVIEW OF THE PIECE: The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary. The piece is worked back and forth with circular needle, top down. Start by working 2 loose bands, then cast on stitches for the neckline between the bands and work the yoke back and forth. When the yoke is finished, divide for the body and sleeves. Continue the body back and forth, while the sleeves wait. The sleeves are then worked in the round. The bands are sewn together mid-back and sewn to the neckline. RIGHT BAND (when the garment is worn): Cast on 12 stitches with circular needle size 4 mm and DROPS Daisy or DROPS Merino Extra Fine. Work RIGHT BAND WITH I-CORD – read description above, back and forth for 4 cm. Now knit together the first 2 stitches from the right side (opposite side to the I-cord). Decrease like this every 3 cm a total of 5 times = 7 band stitches. Continue working until the band measures 21cm, finishing after a row from the wrong side. Cut the strand and lay the piece to one side. LEFT BAND (when the garment is worn): Cast on 12 stitches with circular needle size 4 mm. Work LEFT BAND WITH I-CORD – read description above, back and forth for 4 cm. Now knit together the last 2 stitches from the right side (opposite side to the I-cord). Decrease like this every 3 cm a total of 5 times = 7 band stitches. Continue working until the band measures 21 cm, finish after a row from the right side. Do not cut the strand. Cast on 99-99-99-103-103-103 stitches at the end of the row, then work the 7 stitches from the right band = 113-113-113-117-117-117 stitches. Work 1 row from the wrong side, purling the 99-99-99-103-103-103 cast on stitches and working the 7 band-stitches on each side as before. INFORMATION BEFORE CONTINUING. FRONT AND BACK PIECES: Lace pattern is now worked on the front and back pieces according to the diagrams.. The increases for the V-neck and raglan are drawn into the diagrams. When A.2, A.3 and A.4 have been worked 1 time in height, work 1 more repeat of A.3 between A.2 and A.4. SLEEVES: The sleeves are worked in stocking stitch and increased as described under RAGLAN. YOKE: Work the first row as follows from the right side: 7 band stitches as before, A.1, work 2 GARTER STITCHES – read description above, knit 2, increase 1 stitch for RAGLAN - read description above, 20-20-20-22-22-22 stocking stitches, increase 1 stitch for raglan, knit 2, 2 garter stitches, A,2, A.3 over the next 20 stitches, A.4, 2 garter stitches, knit 2, increase 1 stitch for raglan, 20-20-20-22-22-22 stocking stitches, increase 1 stitch for raglan, knit 2, 2 garter stitches, A.1 and 7 band stitches as before. REMEMBER THE KNITTING TENSION! FIND YOUR SIZE: Pattern is now worked differently in the different sizes. Continue from the section for your size. SIZE S: Increase for raglan and work pattern simultaneously as follows – read both RAGLAN and PATTERN before continuing. RAGLAN: Increase inside 2 stocking stitches on each side of the sleeves every 2nd row 4 times, then every 4th row 10 times = 14 increases on each side of each sleeve. PATTERN: When A.1 has been worked 1 time in height all increases are finished = 289 stitches. Work as follows from the right side: 7 band stitches, A.3 over the next 40 stitches, work the first stitch in A.3, 2 garter stitches, stocking stitch over the sleeve, 2 garter stitches, A.3 over the next 80 stitches, work the first stitch in A.3, 2 garter stitches, stocking stitch over the sleeve, 2 garter stitches, A.3 over the next 40 stitches, work the first stitch in A.3 and 7 band stitches – AT THE SAME TIME on this row work the first BUTTONHOLE – read description above! Work A.3 one time in height, the yoke measures approx. 27 cm from the shoulder. Continue from DIVIDE FOR BODY AND SLEEVES SIZES M-L: Increase for raglan and work pattern simultaneously as follows – read both RAGLAN and PATTERN before continuing. RAGLAN: Increase inside 2 stocking stitches on each side of the sleeves every 2nd row 3-2 times, then every 4th row 13-13 times = 16-15 increases on each side of each sleeve. PATTERN: When A.1 has been worked 1 time in height, the increases towards mid-front are finished; continue increasing for raglan in each transition between body and sleeves, working as follows from the right side: 7 band stitches, A.3 over the next 30 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 60 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 30 stitches, work the first stitch in A.3 and 7 band stitches - AT THE SAME TIME on this row work the first BUTTONHOLE – read description above! Continue increasing like this until A.2, A.3 and A.4 have been worked 1-1 time in height. All increases are finished. There are 317-313 stitches and the yoke measures approx. 27-27 cm from the shoulder. Continue from DIVIDE FOR BODY AND SLEEVES. SIZES XL - XXL: Increase for raglan and work pattern simultaneously as follows – read both RAGLAN and PATTERN before continuing. RAGLAN: Increase inside 2 stocking stitches on each side of the sleeves every 2nd row 11-7 times, then every 4th row 12-14 times = 23-21 increases on each side of each sleeve. PATTERN: When A.1 has been worked 1 time in height, the increases towards mid-front are finished; continue increasing for raglan in each transition between body and sleeves, working as follows from the right side: 7 band stitches, A.3 over the next 30 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 60 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 30 stitches, work the first stitch in A.3 and 7 band stitches - AT THE SAME TIME on this row work the first BUTTONHOLE – read description above! Continue increasing like this until A.2, A.3 and A.4 have been worked 1-1 time in height. Work as follows from the right side: 7 band stitches, A.5, A.3 over the next 30 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 70 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 30 stitches, A.6 and 7 band stitches. Continue increasing like this until A.2, A.3 and A.4 have been worked 1-1 time in height. All increases are finished. There are 369-361 stitches and the yoke measures approx. 32-32 cm from the shoulder. Continue from DIVIDE FOR BODY AND SLEEVES. SIZE XXXL: Increase for raglan and work pattern simultaneously as follows – read both RAGLAN and PATTERN before continuing. RAGLAN: Increase inside 2 stocking stitches on each side of the sleeves every 2nd row 6 times, then every 4th row 17 times = 23 increases on each side of each sleeve. PATTERN: When A.1 has been worked 1 time in height, the increases towards mid-front are finished; continue increasing for raglan in each transition between body and sleeves, working as follows from the right side: 7 band stitches, A.3 over the next 30 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 60 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 30 stitches, work the first stitch in A.3 and 7 band stitches - AT THE SAME TIME on this row work the first BUTTONHOLE – read description above! Continue increasing like this until A.2, A.3 and A.4 have been worked 1 time in height. Work as follows from the right side: 7 band stitches, A.5, A.3 over the next 30 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 70 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 30 stitches, A.6 and 7 band stitches. Continue increasing like this until A.2, A.3 and A.4 have been worked 1 time in height. Work as follows from the right side: 7 band stitches, A.3 over the next 40 stitches, work A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 80 stitches, A.4, 2 garter stitches, work and increase as before over the sleeve, 2 garter stitches, A.2, A.3 over the next 40 stitches, work the first stitch in A.3 and 7 band stitches. Continue increasing like this until A.2, A.3 and A.4 have been worked 1 time in height. All increases are finished. There are 389 stitches and the yoke measures approx. 36 cm from the shoulder. Continue from DIVIDE FOR BODY AND SLEEVES. DIVIDE FOR BODY AND SLEEVES – ALL SIZES: Work as follows from the right side: Over the first 50-55-55-60-60-65 stitches, work the band and knit the other stitches (= left front piece), place the next 52-56-54-72-68-72 stitches on a thread for the sleeve, cast on 15-15-25-15-25-25 stitches under the sleeve, knit 85-95-95-105-105-115 stitches, place the next 52-56-54-72-68-72 stitches on a thread for the sleeve, cast on 15-15-25-15-25-25 stitches under the sleeve, knit and work the band over the last 50-55-55-60-60-65 stitches (= right front piece). BODY – ALL SIZES: = 215-235-255-255-275-295 stitches. FIND YOUR SIZE: Work the section for your size below. SIZES S - M - L- XXXL: Start from wrong side and work 2nd row in the diagrams as follows: Work 7 band stitches as before, A.6, A.3 until there are 12 stitches left, A.5 and 7 band stitches as before. Continue in pattern like this. NOTE! Start on row 3 in the diagrams. * Work 7 band stitches as before, A.5, A.3 until there are 13 stitches left, A.6 and 7 band stitches as before. Work the diagrams 1 time in height. Continue with 7 band stitches as before, A.7, A.3 until there are 18 stitches left, A.8 and 7 band stitches as before. Work the diagrams 1 time in height *. Work from *-* until the body measures 16-18-20-16 cm, finishing after a complete repeat of A.3 in height. Go to ALL SIZES. SIZES XL - XXL: Start from wrong side and work 2nd row in the diagrams as follows: Work 7 band stitches as before, A.8, A.3 until there are 17 stitches left, A.7 and 7 band stitches as before. Continue in pattern like this. NOTE! Start on row 3 in the diagrams. * Work 7 band stitches as before, A.7, A.3 until there are 18 stitches left, A.8 and 7 band stitches as before. Work the diagrams 1 time in height. Work 7 band stitches as before, A.5, A.3 until there are 13 stitches left, A.6 and 7 band stitches as before. Work the diagrams 1 time in height *. Work from *-* until the body measures 18-16 cm, finishing after a complete repeat of A.3 in height. Go to ALL SIZES. ALL SIZES: On the next row (= right side) begin the rib, AT THE SAME TIME increase 42-42-48-48-48-58 stitches evenly on the row = 257-277-303-303-323-353 stitches, working as follows: Change to circular needle size 3 mm, work 7 band stitches as before, rib (knit 1, purl 1 – remember the increases) until there are 8 stitches left, knit 1 and 7 band stitches as before. When the rib measures 5-5-5-6-6-6 cm, cast off. The jacket measures approx. 48-50-52-54-56-58 cm from the shoulder. SLEEVES: Place the 52-56-54-72-68-72 stitches from the thread on one side of the piece on circular needle size 4 mm and knit up 1 stitch in each of the 15-15-25-15-25-25 stitches cast on under the sleeve = 67-71-79-87-93-97 stitches. Insert 1 marker in the middle stitch of the 15-15-25-15-25-25 stitches under the sleeve – start the round just before this marker-stitch. Work stocking stitch in the round. When the sleeve measures 3 cm from the division, decrease under the sleeve – read DECREASE TIP, repeat this decrease when the sleeve measures 8-8-9-6-6-6 cm = 63-67-75-83-89-93 stitches. Work until the sleeve measures 15-16-17-12-13-10 cm from the division. Change to double pointed needles size 3 mm. Work rib (knit 1, purl 1), AT THE SAME TIME increase 13-13-15-17-19-19 stitches evenly on round 1 = 76-80-90-100-108-112 stitches. Cast off when the rib measures 5-5-5-6-6-6 cm. ASSEMBLY: Sew the buttons onto the left band. Sew the bands together mid-back, then sew the bands to the neckline, stretching the bands a little to sew it on. |
|||||||||||||||||||
Diagram explanations |
|||||||||||||||||||
|
|||||||||||||||||||
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them! Do you need help with this pattern?You'll find tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Comments / Questions (65)
Ingrid Ehret wrote:
Hallo,wie ist dies bei Raglan zu verstehen: In jeder 2. Reihe 3-2 ?in der Höhe, in jeder 4. Reihe 13-13 ? in der Höhe . Werden drei oder zwei das erste mal zugeneommen und beim 2. Mal 13 und nochmal 13. Ist mir nicht erklärlich. Um baldige Antwort danke ich Ihnen da ich weiterstricken möchte.
21.04.2024 - 16:11DROPS Design answered:
Liebe Frau Ehret, beim Abschnitt "M-L" ird manfür den Raglan/Ärmel: 3 Mal in M und 2 Mal in L zunehmen. So wird man insgesamt 16 Mal in M und 15 Mal in L zunehmen. Viel spaß beim Stricken!
22.04.2024 - 09:08Jannie wrote:
Bij de start van de pas met 113 steken kom ik niet uit met de beschrijving. Waar begin ik met A1, boven of onderaan het telpatroon? Als ik bovenaan begin heb ik al 43 steken gebreid en dan komen er nog heel veel
19.04.2024 - 22:37DROPS Design answered:
Dag Jannie,
Je breit eerst 7 voorbiessteken en dan begin je gelijk met A.1. Het telpatroon lees je van onder naar boven, dat betekent dus dat A.1 1 steek heeft op de eerste naald.
22.04.2024 - 21:34Christine wrote:
Bonjour Je pense qu'il y a une erreur pour DOS/DEVANTS : pour la taille L si on suit les indications "sur l'envers tricoter le rang 2 de A3 avec 7 mailles de bordure..." le motif se trouve décalé. J'ai fait dès ce moment le rang 2 de A5/A3/A6 avec les 7 mailles de bordure de chaque côté et cela fonctionnera très bien.
15.04.2024 - 17:13DROPS Design answered:
Bonjour Christine, quand les diagrammes sont terminés, on a 313 mailles en taille L, on tricote le 1er rang de A.3 sur toutes les mailles lors de la division, ainsi, au rang suivant sur l'envers (le 1er rang du dos/devants), on tricote le 2ème rang de A.3 (on ne doit plus augmenter). Bon tricot!
16.04.2024 - 08:03Yvonne wrote:
Har 251 m sammanlagt. 41 m x2 till mönster. Helt ok. Hur många maskor till ärm resp ok när A1 är stickat en gång? Storlek M.
15.04.2024 - 14:21DROPS Design answered:
Hei Yvonne. Hvert erme skal da bestå da: 2 rettmaskene + de økte maskene til raglan + de 20 maskene du hadde i starten + de økte maskene til raglan + 2 rettmaskene. Mvh DROPS Design
23.04.2024 - 07:11Yvonne wrote:
Hej igen. Frågan oklar? Har jag missat något då jag inte får ihop det på första varvet A 1.
13.04.2024 - 23:02DROPS Design answered:
Hei Yvonne. Se vårt forrige svar til deg, evnt opplys hvor mange masker du har etter å ha strikket A.1 1 gang i høyden. mvh DROPS Design
15.04.2024 - 09:09Cynthia Vasiento wrote:
Hi! In the section where I am completing the raglan, it says to increase every 4th row 13 times, but there isn’t enough rows when completing A2 A3 A4 1 time, to accomplish that. Is there something I’m missing?
10.04.2024 - 20:00DROPS Design answered:
Dear Mrs Vasiento, when A.1 is done in height, work now these stitches (seen from RS) following diagrams A.3 and A.4 after the front band stsand A.2 and A.3 before the front band stitches, ie as explained under section PATTERN just after section RAGLAN. Happy knitting!
11.04.2024 - 07:09Yvonne wrote:
Hej. Skickar i storlek M Skall börja på första varvet efter A1. Förstår inte beskrivningen då jag inte har så många maskor mellan ärmarna. A2, och A3 över de nästa 60 maskor? Tacksam för förklaring av varvet
10.04.2024 - 16:11DROPS Design answered:
Hei Yvonne. Har du økt til raglan så mange ganger det står i oppskriften? (det økes på hver 2.pinne 3 ganger, deretter på hver 4.pinne 13 ganger = 16 økninger i hver side av hvert erme, altså 16 x 4 = 64 økte raglansøkninger). Samtidig økes det masker i A.2 og A.4. mvh DROPS Design
15.04.2024 - 08:42Monica Ahlberg wrote:
Tack, det måste jag kolla när jag kommer hem. jag mätte bara mönsterstickningen.
09.04.2024 - 13:22Monica Ahlberg wrote:
Hej! Jag stickar storlek M och det står att när A1 är färdigstickat ska man göra det första knapphålet och stycket ska vara ca 23 cm. Det är omöjligt eftersom stickfastheten är 28 m på höjden och A1 är 48 varv. För att det ens ska bli 20 cm krävs 56 varv om man ska hålla stickfastheten. Jag har stickat efter stickfastheten, så mitt sycke är ca 18 cm efter att jag stcikat A1 en gång. Hur ska jag tänka? Det blir alldeles för kort. Med vänliga häslningar Monica
09.04.2024 - 09:08DROPS Design answered:
Hej Monica, stemmer det ikke når du tæller det øverste stykke med op til skulderen (som er strikket uden mønster)?
09.04.2024 - 11:51Barbara wrote:
Czy przerabiając w kolejności na prawej stronie robótki :A1-rękaw-A2-A3-A4- rekaw- A1, to potem na lewej stronie w takiej samej kolejności? Czy w odwrotnej czyli A1-rekaw-A4-A3-A2-rękaw-A1 ? I schemat A2 ma 10 oczy, a A4 11 oczy raportu. Czy to prawidłowe? Pozdrawiam
07.04.2024 - 09:27DROPS Design answered:
Witaj Basiu, na lewej stronie schematy zaczynasz w odwrotnej kolejności, czyli tutaj będzie A1-rekaw-A4-A3-A2-rękaw-A1. Zobacz także kurs DROPS TUTAJ. Schemat A2 ma 10 oczek, a A4 11 oczek i jest to poprawne. Pozdrawiamy!
08.04.2024 - 08:23